eec ls : Project Data Sheet

United Summit Centre

Dhaka, Bangladesh

Image courtesy of United Summit Centre

Client : IPCO Hotels Limited
Location : Dhaka, Bangladesh
Architect : Volumezero Ltd
Project Value : [Confidential]
Completion Date : Ongoing
Services
• Mechanical
• Electrical
• Hydraulics/Plumbing
• Vertical Transportation
• Fire Protection
• Civil
• Structural
• Geotechnical

The United Summit Centre development is a re-start project with which EEC Lincolne Scott has been involved since 2003. The development now comprises:
          •    Retail Complex of 78,000 m2 with cinemas, extensive dining areas and sub-ground parking for over 1,000 cars.
          •    Holiday Inn Hotel 300 key (21,000 m2)
          •    Intercontinental Hotel 400 key (48,000 m2 expanded up to 50,000 m2)
          •    8 storey Office Building with 6 level car parking    (2 level basement) with In-flight Catering Facility at the lowest basement level
          •    10 storey Office Building and Banquet Hall with     3 level basement car parking

The scope of work and services provided by EEC Lincolne Scott is for design review, design completion, re-design and the new design elements for all engineering disciplines under a very tight delivery schedule. This work was undertaken while construction work for the Retail complex was re-started and thus ongoing.

Key features of the structural design were retrofit and design modification for the partially constructed retail atrium with significantly enlarged openings and additional connecting bridges.
Extension of the floor slab for the partially constructed Intercontinental Hotel to improve the room sizes to meet current industry standards for a 5 star hotel.

Utilization of post-tension concrete design for the office buildings to minimise the structural depth to allow the maximum number of floors to be built within the stringent IATA and BCAA height restriction for the site due to its proximity to the airport.

The MEP design also had to be updated to suit the re-planning of the original buildings, and especially with the design of a co-generation power generation building on the site along with relocating and re-planning of all the central utilities plant such as the water treatment facility, waste water treatment facility and chilled water system which was incorporated into the power generation building with reciprocating gas engines as the client preferred primary power system.

The services designs incorporate various energy saving features such as demand controlled outside air supply to air conditioning systems, demand controlled car park ventilation systems, variable speed drives on air conditioning system pumps, extensive metering system and comprehensive building management system.



..........................................................................................................................
EEC LS
About us
           Our Story
           Our Philosophy
           Project Collaboration Philosophy
           Delivery Strategy
          Our Team

Service
           Civil and Structural
           Air conditioning and Ventilation
           Electrical and Communications
           Fire Protection
           Plumbing and Hydraulics
           Vertical Transportation Services
           Sustainable Design Services
           Building Information Modelling : BIM

Project
           Showcase Our Work
           List of Project

Contact Form

We are glad to hear from you


Please enter your name
Say something!

Contact

EEC LINCOLNE SCOTT CO.,LTD.
42 EEC Academy 2 Building, Soi Ram Inthra 97, Khan Na Yao, Khan Na Yao District, Bangkok 10230 Thailand.
Google Earth / Map
Tel : +66 2130 4599
Fax : +66 2130 4594
[email protected]

Page Loader